PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
PT. Garuda Metalindo is a producer of fasteners and engineering components, committed to delivering 100% defect-free products. However, recent customer complaints have highlighted discrepancies between product standards and received goods. The Quality Control Department (QC) at Plant 3 (GM 3) bea...
Saved in:
Main Author: | Antonio, Steven |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83755 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
by: Hartik, Sumara, et al.
Published: (2019) -
PERANCANGAN ULANG DUDUKAN POROS PADA MESIN ROLL SHEETER KARET DENGAN MENERAPKAN PRINSIP DESIGN FOR MANUFACTURE AND ASSEMBLY.
by: Yuda, Darma -
Menerapkan Proses Bootstrapping dalam Proses Estimasi Reliabilitas
by: Widhiarso, Wahyu
Published: (2013) -
PERANCANGAN ULANG PROSES MANUFAKTUR KOMPONEN COLLAR DECOMP PADA SEPEDA MOTOR.
by: Aditya Cipta Wijaya, Jeffry -
PERANCANGAN ULANG PROSES MANUFAKTUR KOMPONEN POINT NEUTRAL PADA SEPEDA MOTOR.
by: Ihsan, Daniel