RISK MANAGEMENT FOR SAFETY IN WELLPAD AND POWER PLANT AREAS OF GEOTHERMAL POWER PLANTS (PLTP X) USING THE HIRARC METHODE

Indonesia Indonesia has the second-largest geothermal power capacity in the world, reaching 2,133 MW in 2020 and contributing 3.01% to the national electricity production. Geothermal power plants (PLTP) constitute an industry with high risks, particularly during the wellpad exploration stage. Acc...

Full description

Saved in:
Bibliographic Details
Main Author: Arif Yutaro Zoebar, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/84330
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia