RISK MANAGEMENT FOR SAFETY IN WELLPAD AND POWER PLANT AREAS OF GEOTHERMAL POWER PLANTS (PLTP X) USING THE HIRARC METHODE
Indonesia Indonesia has the second-largest geothermal power capacity in the world, reaching 2,133 MW in 2020 and contributing 3.01% to the national electricity production. Geothermal power plants (PLTP) constitute an industry with high risks, particularly during the wellpad exploration stage. Acc...
Saved in:
Main Author: | Arif Yutaro Zoebar, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/84330 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DISPERSION SIMULATION OF GASEOUS HYDROGEN SULFIDE CONCENTRATIONS FROM THE GEOTHERMAL POWER PLANT ON GARUT AND TASIKMALAYA AREAS, WEST JAVA
by: Setiabudi, Alex -
ANALYSIS OF MANAGEMENT AND FACTORS INFLUENCING THE BEHAVIORAL INTENTION OF NEAR MISS REPORTING IN GEOTHERMAL POWER PLANT (CASE STUDY: PT. X, BANDUNG REGENCY )
by: Atikah Hamdani, Shafira -
H2S DISPERSION FROM GEOTHERMAL POWER PLANT WEST JAVA IN FLAT TERRAIN AND COMPLEX TERRAIN (AIR MODELING)
by: Ario Wibisono, Guntur -
RISK ANALYSIS USING THE HIRARC METHOD (HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL) ON LIFTING AND RIGGING WORK AT PT X, RIAURISK ANALYSIS USING THE HIRARC (HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL) METHOD ON LIFTING AND RIGGING WORK AT PT X, RIAU
by: Nikson Tumanggor, Jeremy -
DESIGN OF SEWERAGE AND WASTEWATER TREATMENT PLANT IN PT PERTAMINA GEOTHERMAL ENERGY AREA KAMOJANG
by: Rinaidi, Destria