RISK MANAGEMENT FOR SAFETY IN WELLPAD AND POWER PLANT AREAS OF GEOTHERMAL POWER PLANTS (PLTP X) USING THE HIRARC METHODE
Indonesia Indonesia has the second-largest geothermal power capacity in the world, reaching 2,133 MW in 2020 and contributing 3.01% to the national electricity production. Geothermal power plants (PLTP) constitute an industry with high risks, particularly during the wellpad exploration stage. Acc...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/84330 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |