導出完成 — 

DESIGN OF SOFT SOIL IMPROVEMENT AND SLOPE REINFORCEMENT FOR EXCAVATION AND EMBANKMENT ON THE JAKARTA – CIKAMPEK II SELATAN TOLL ROAD PROJECT FROM STA 09+775 TO STA 15+000

Jakarta-Cikampek II South Toll Road Project is a part of the National Strategic Project developed through a collaboration between PT. Jasa Marga and PT. Wiranusantara Bumi. This toll road spans 64 kilometers and is divided into three construction sections: Section 1 (Jatiasih – Setu) covers 9.3 km,...

全面介紹

Saved in:
書目詳細資料
主要作者: Rama Adamas, Nur
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/84936
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!