DESIGN OF SOFT SOIL IMPROVEMENT AND SLOPE REINFORCEMENT FOR EXCAVATION AND EMBANKMENT ON THE JAKARTA – CIKAMPEK II SELATAN TOLL ROAD PROJECT FROM STA 09+775 TO STA 15+000

Jakarta-Cikampek II South Toll Road Project is a part of the National Strategic Project developed through a collaboration between PT. Jasa Marga and PT. Wiranusantara Bumi. This toll road spans 64 kilometers and is divided into three construction sections: Section 1 (Jatiasih – Setu) covers 9.3 km,...

Full description

Saved in:
Bibliographic Details
Main Author: Rama Adamas, Nur
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84936
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia