DESIGN OF SOFT SOIL IMPROVEMENT AND SLOPE REINFORCEMENT FOR EXCAVATION AND EMBANKMENT ON THE JAKARTA â CIKAMPEK II SELATAN TOLL ROAD PROJECT FROM STA 09+775 TO STA 15+000
Jakarta-Cikampek II South Toll Road Project is a part of the National Strategic Project developed through a collaboration between PT. Jasa Marga and PT. Wiranusantara Bumi. This toll road spans 64 kilometers and is divided into three construction sections: Section 1 (Jatiasih – Setu) covers 9.3 km,...
Saved in:
Main Author: | Rama Adamas, Nur |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84936 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION AND DESIGN PLANNING OF THE BALIKPAPAN - SAMARINDA TOLL ROAD SECTION 1 (STA 4+000 - STA 10+000)
by: Alexander Benedict S, Joshua -
GEOMETRIC AND PAVEMENT DESIGN EVALUATION OF JAKARTA - CIKAMPEK II SELATAN TOLL ROAD (STA 18+400 - STA 31+200)
by: Al Imran, Farhan -
EVALUATION OF GEOMETRIC AND PAVEMENT DESIGN OF JAKARTA-CIKAMPEK II SELATAN TOLL ROAD STA 24+150 â STA 34+150
by: Shafira Ramadhanty, Zayda -
EVALUATION AND DESIGN PLANNING OF THE BALIKPAPAN â SAMARINDA TOLL ROAD SECTION 1 (STA 4+000 â STA 10+000
by: Sianipar, Steven -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: Ramadhan Haribowo, Azhar