ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)

The Java 9&10 2x1000MW Cilegon Steam Power Plant (PLTU) Project is one of the National Strategic projects and the largest in Indonesia now. During the construction of this PLTU there is a Coal Shed building, which is used as a storage place for coal in quantities of tens of thousands of tonna...

Full description

Saved in:
Bibliographic Details
Main Author: Ekky Gigih Prakoso, Muhammad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84998
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:84998
spelling id-itb.:849982024-08-19T12:20:17ZANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA) Ekky Gigih Prakoso, Muhammad Indonesia Theses AHP method, selection of design alternatives, Coal Shed Work INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84998 The Java 9&10 2x1000MW Cilegon Steam Power Plant (PLTU) Project is one of the National Strategic projects and the largest in Indonesia now. During the construction of this PLTU there is a Coal Shed building, which is used as a storage place for coal in quantities of tens of thousands of tonnages. The area of the Coal Shed building, if used as an analogy, is the size of 4 football fields, so appropriate design and implementation methods are needed because they greatly influence the achievement of the Project Milestone. Therefore, an in-depth analysis is needed by considering all variables that influence the determination of construction methods. One method that can be applied to assist in making appropriate construction method decisions is the Analytical Hierarchy Process (AHP) method. This method could develop a priority scale (as a weighting factor) from complex variables and is easy to apply, so this method can be used as a tool for decision making in determining the appropriate construction method. Data collection was carried out through questionnaires and in-depth interviews with respondents who have expertise (good knowledge, experience, and skills in preparing construction methods). The research results show that the AHP method can be structured as a decision-making system for determining the appropriate construction method for Coal Shed work. The priority weights resulting from AHP can be used as parameters to determine the value of decisions on determining construction methods based on the availability of resources owned by the project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Java 9&10 2x1000MW Cilegon Steam Power Plant (PLTU) Project is one of the National Strategic projects and the largest in Indonesia now. During the construction of this PLTU there is a Coal Shed building, which is used as a storage place for coal in quantities of tens of thousands of tonnages. The area of the Coal Shed building, if used as an analogy, is the size of 4 football fields, so appropriate design and implementation methods are needed because they greatly influence the achievement of the Project Milestone. Therefore, an in-depth analysis is needed by considering all variables that influence the determination of construction methods. One method that can be applied to assist in making appropriate construction method decisions is the Analytical Hierarchy Process (AHP) method. This method could develop a priority scale (as a weighting factor) from complex variables and is easy to apply, so this method can be used as a tool for decision making in determining the appropriate construction method. Data collection was carried out through questionnaires and in-depth interviews with respondents who have expertise (good knowledge, experience, and skills in preparing construction methods). The research results show that the AHP method can be structured as a decision-making system for determining the appropriate construction method for Coal Shed work. The priority weights resulting from AHP can be used as parameters to determine the value of decisions on determining construction methods based on the availability of resources owned by the project.
format Theses
author Ekky Gigih Prakoso, Muhammad
spellingShingle Ekky Gigih Prakoso, Muhammad
ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
author_facet Ekky Gigih Prakoso, Muhammad
author_sort Ekky Gigih Prakoso, Muhammad
title ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
title_short ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
title_full ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
title_fullStr ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
title_full_unstemmed ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
title_sort analysis of alternative selection for coal shed building using the analytical hierarchy process (ahp) method (case study : coal fired power plant project on epc division of pt. hutama karya)
url https://digilib.itb.ac.id/gdl/view/84998
_version_ 1822010574009008128