ANALYSIS OF ALTERNATIVE SELECTION FOR COAL SHED BUILDING USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY : COAL FIRED POWER PLANT PROJECT ON EPC DIVISION OF PT. HUTAMA KARYA)
The Java 9&10 2x1000MW Cilegon Steam Power Plant (PLTU) Project is one of the National Strategic projects and the largest in Indonesia now. During the construction of this PLTU there is a Coal Shed building, which is used as a storage place for coal in quantities of tens of thousands of tonna...
Saved in:
Main Author: | Ekky Gigih Prakoso, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84998 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
KNOWLEDGE MANAGEMENT ASSESSMENT IN EPC DIVISION PT. HUTAMA KARYA TO SUPPORT ACCELERATION AGILE TRANSFORMATION
by: Ahmad Wicaksono, Widhi -
REDESIGN OF COAL SHED AT JAWA 9 & 10 COAL FIRED STEAM POWER PLANT PROJECT
by: Alfarazi, Muhammad -
ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
by: Furukawa, Takahide -
EVALUATION THE IMPACT OF ENTERPRISE RESOURCE PLANNING (ERP) IMPLEMENTATION ON EPC. STUDI KASUS DI PT HUTAMA KARYA (PERSERO)
by: Sujatmiko, Hariyadi -
LOCATION MODEL OF COAL BLENDING FACILITIES TO ENSURE COAL SUPPLY FOR COAL FIRED POWER PLANTS IN JAVA ISLAND
by: Ikhsan Pratama, Hanif