UNCERTAINTY AND RISK ANALYSIS IN THE CONSTRUCTION SCHEDULE OF SDN SUKATANI 7
The high population in Indonesia leads to increased demand for infrastructure. One such need is for school buildings, exemplified by SDN Sukatani 7. The planning and execution of the SDN Sukatani 7 construction project are influenced by time, quality, and cost. Time is the aspect with the highest ri...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85560 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |