UNCERTAINTY AND RISK ANALYSIS IN THE CONSTRUCTION SCHEDULE OF SDN SUKATANI 7

The high population in Indonesia leads to increased demand for infrastructure. One such need is for school buildings, exemplified by SDN Sukatani 7. The planning and execution of the SDN Sukatani 7 construction project are influenced by time, quality, and cost. Time is the aspect with the highest ri...

全面介紹

Saved in:
書目詳細資料
主要作者: Christian Sitompul, Nico
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/85560
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!