UNCERTAINTY AND RISK ANALYSIS IN THE CONSTRUCTION SCHEDULE OF SDN SUKATANI 7
The high population in Indonesia leads to increased demand for infrastructure. One such need is for school buildings, exemplified by SDN Sukatani 7. The planning and execution of the SDN Sukatani 7 construction project are influenced by time, quality, and cost. Time is the aspect with the highest ri...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/85560 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
成為第一個發表評論!