UNCERTAINTY AND RISK ANALYSIS IN THE CONSTRUCTION SCHEDULE OF SDN SUKATANI 7
The high population in Indonesia leads to increased demand for infrastructure. One such need is for school buildings, exemplified by SDN Sukatani 7. The planning and execution of the SDN Sukatani 7 construction project are influenced by time, quality, and cost. Time is the aspect with the highest ri...
Saved in:
Main Author: | Christian Sitompul, Nico |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85560 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN PANGKAL DAN PILAR JEMBATAN BARU BH. 372 KM. 114+572 ANTARA CIGANEA - SUKATANI
by: Wahyu Setiawati, Rini -
Constructing risk measures from uncertainty sets
by: Natarajan, K., et al.
Published: (2013) -
Analisis dan simulasi numeris kelongsoran pada Embankment jalur Kereta Api Ciganea-Sukatani Km 113+300
by: , HANDIMAN, Iman, et al.
Published: (2005) -
PERANCANGAN PONDASI PANGKAL PILAR JEMBATAN BARU BR 355 KM 110 + 532 PADA PARTIAL DOUBLE TRACK CIGANEA - SUKATANI
by: Budi Widodo, P.S. -
Flexible scheduling of microgrid with uncertainties considering expectation and robustness
by: Li, Yuanzheng, et al.
Published: (2019)