#TITLE_ALTERNATIVE#
Considering that Indonesia is an archipelagic country with so many island and with a huge coastline, so it required a big effort to keep the groundwater stability in coastal area in a purpose that the availability of fresh water consumption keep remain to awake, because coastal area is a rapidly gro...
Saved in:
Main Author: | GINO SIMANJUNTAK (NIM 12103060), MAYCHEL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8563 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
by: Gino Simanjuntak, Maychel -
#TITLE_ALTERNATIVE#
by: SIMANJUNTAK (NIM 12103044), RICARDI -
#TITLE_ALTERNATIVE#
by: Simanjuntak (NIM 25092009), Salomo -
#TITLE_ALTERNATIVE#
by: SIMANJUNTAK (NIM 13601049), IO -
#TITLE_ALTERNATIVE#
by: SIMANJUNTAK (NIM: 29110454), AUGUSDINI