EVALUATION AND DESIGN PLANNING OF THE BALIKPAPAN â SAMARINDA TOLL ROAD SECTION 1 (STA 4+000 â STA 10+000
Sustainable road network infrastructure development plays an important role in supporting every aspect of the activities of various sectors in Indonesia, including the National Capital of the Archipelago. The Balikpapan – Samarinda (Balsam) Toll Road is part of the road network for the National Capi...
Saved in:
Main Author: | Sianipar, Steven |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85807 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION AND DESIGN PLANNING OF THE BALIKPAPAN - SAMARINDA TOLL ROAD SECTION 1 (STA 4+000 - STA 10+000)
by: Alexander Benedict S, Joshua -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: Ramadhan Haribowo, Azhar -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: C.P.H. Sihombing, Ari -
EVALUATION OF GEDEBAGE - TASIKMALAYA - CILACAP (GETACI) TOLL ROAD PLANNING AND FEASIBILITY SECTION OF GEDEBAGE - NAGREG (STA. 0+000 - STA. 22+850)
by: Khairunnisa, Iman -
EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG - KAYU AGUNG (STA 140+000 S.D. 161+600)
by: Fatra Hadi, Jehant