SELECTING THE OPTIMUM PROJECT DELIVERY METHOD FOR GASOLINE SULFUR HYDROTREATING PROJECT AT RU-III PLAJU AND RU-VI BALONGAN REFINERIES OF PT KILANG PERTAMINA INTERNATIONAL (KPI) BY USING ANALYTIC HIERARCHY PROCESS (AHP)
PT Kilang Pertamina International (KPI), as a subsidiary of PT Pertamina (Persero), currently operates and fully administers the refinery business subholding, intends to build new Gasoline Sulfur Hydrotreater (GSH) unit to comply with the latest government regulation for Sulphur content of Gasoline...
Saved in:
Main Author: | Achmad Bastomi, Andry |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85819 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROJECT MANAGEMENT APPLICATION AND RECOMMENDATION OF TURNAROUND OIL REFINERY PROJECT RU V PERTAMINA
by: Andari Putri, Rima -
ESTIMASI WAKTU OPTIMUM PELAKSANAAN SHUTDOWN MAINTENANCE DI KILANG CDU BALIKPAPAN � PERTAMINA RU V
by: , AIN SAHARA, et al.
Published: (2012) -
USULAN PERBAIKAN METODE KERJA UNTUK MENGURANGI GANGGUAN OTOT RANGKA PADA PEKERJA DIVISI HUMAN CAPITAL DI PT KPI RU VI BALONGAN
by: Rayhan Syaputra, Fadhil -
Laporan Pelaksanaan Magang Di PT. Pertamina (Persero) RU VI Balongan Gambaran Intensitas Pencahayaan Dan Indoor Air Quality Pada Area Workshop PT. Pertamina (Persero) Refinery Unit VI Balongan
by: Muhammad Bagus Fachrudin
Published: (2019) -
IDENTIFYING RISK FACTORS AND MITIGATION STRATEGIES TO SOLVE UNCLOSED ISSUE IN RU VI BALONGAN
by: Abdurrahman Hayat, Hazman