RISK MANAGEMENT AND RISK COST ESTIMATION IN TANJUNG BATU PORT DEVELOPMENT PROJECT, BELITUNG REGENCY, BANGKA BELITUNG ISLANDS PROVINCE
Tanjung Batu Port is projected to handle a cargo capacity of 12 million tons/year, whereas previously it could only handle 2.4 million tons/year. This development is being undertaken due to the high potential for cargo, despite the port’s low cargo service infrastructure capacity and operational lim...
Saved in:
Main Author: | Nurhasanah, Lanny |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86552 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF GENERAL CARGO WHARF STRUCTURE DECK ON PILE TYPE AT TANJUNG BATU PORT, BELITUNG REGENCY, BANGKA BELITUNG ISLANDS PROVINCE
by: Nurhasanah, Lanny -
PROSPECTIVE AREA FOR THE DEVELOPMENT OF ASTROTOURISM IN BANGKA REGENCY BANGKA BELITUNG ISLANDS PROVINCE
by: Zainuddin, Febri -
STUDY OF GRANIOTIDS AND RARE EARTH ELEMENT IN BELITUNG ISLAND, BANGKA BELITUNG PROVINCE
by: Ferninand Gabe, Culbert -
Design of Coastal Protective Structures at Pantai Penyak, Bangka Belitung Regency, Kepulauan Bangka Belitung Province
by: Ridho, Muhammad -
GEOLOGY AND MICROSTRUCTURAL STUDY OF PEMALI, BANGKA REGENCY, BANGKA BELITUNG ISLANDS
by: Vidi Faizal, Muhamad