QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planni...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80472 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |