QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS

Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planni...

Full description

Saved in:
Bibliographic Details
Main Author: Lucas Sinaga, Raditya
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80472
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80472
spelling id-itb.:804722024-01-23T11:18:20ZQUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS Lucas Sinaga, Raditya Indonesia Final Project Reserve Optimation, Quartz Sand, Tin Processing Residue, Mine Scheduling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80472 Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planning. Reserve estimation determines the amount of quartz sand mined based on the optimal pit shell. Reserve estimation shows that A Block contains 4,24 million tonnes of total reserve, B Block 6,45 million tonnes of total reserve, C Block contains 16,25 million tonnes of total reserve, D Block contains 10,2 million tonnes of total reserve, and E Block contains 3,19 million tonnes of total reserve. A Block, B Block, and C Block mining is later scheduled to fulfill production target for four years for A and B Block, and also eight years for C Block. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planning. Reserve estimation determines the amount of quartz sand mined based on the optimal pit shell. Reserve estimation shows that A Block contains 4,24 million tonnes of total reserve, B Block 6,45 million tonnes of total reserve, C Block contains 16,25 million tonnes of total reserve, D Block contains 10,2 million tonnes of total reserve, and E Block contains 3,19 million tonnes of total reserve. A Block, B Block, and C Block mining is later scheduled to fulfill production target for four years for A and B Block, and also eight years for C Block.
format Final Project
author Lucas Sinaga, Raditya
spellingShingle Lucas Sinaga, Raditya
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
author_facet Lucas Sinaga, Raditya
author_sort Lucas Sinaga, Raditya
title QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
title_short QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
title_full QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
title_fullStr QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
title_full_unstemmed QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
title_sort quartz sand reserve estimation and mine scheduling of pt xyz in bangka belitung islands
url https://digilib.itb.ac.id/gdl/view/80472
_version_ 1822996809427976192