QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planni...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80472 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:80472 |
---|---|
spelling |
id-itb.:804722024-01-23T11:18:20ZQUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS Lucas Sinaga, Raditya Indonesia Final Project Reserve Optimation, Quartz Sand, Tin Processing Residue, Mine Scheduling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80472 Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planning. Reserve estimation determines the amount of quartz sand mined based on the optimal pit shell. Reserve estimation shows that A Block contains 4,24 million tonnes of total reserve, B Block 6,45 million tonnes of total reserve, C Block contains 16,25 million tonnes of total reserve, D Block contains 10,2 million tonnes of total reserve, and E Block contains 3,19 million tonnes of total reserve. A Block, B Block, and C Block mining is later scheduled to fulfill production target for four years for A and B Block, and also eight years for C Block. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Residual quartz sand from tin processing activities can be processed into marketable
material. To do this, quartz sand mining is to be carried out in A Block, B Block, C
Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling
are inseparable from the quartz sand mine planning. Reserve estimation determines
the amount of quartz sand mined based on the optimal pit shell. Reserve estimation
shows that A Block contains 4,24 million tonnes of total reserve, B Block 6,45
million tonnes of total reserve, C Block contains 16,25 million tonnes of total
reserve, D Block contains 10,2 million tonnes of total reserve, and E Block contains
3,19 million tonnes of total reserve. A Block, B Block, and C Block mining is later
scheduled to fulfill production target for four years for A and B Block, and also
eight years for C Block. |
format |
Final Project |
author |
Lucas Sinaga, Raditya |
spellingShingle |
Lucas Sinaga, Raditya QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
author_facet |
Lucas Sinaga, Raditya |
author_sort |
Lucas Sinaga, Raditya |
title |
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
title_short |
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
title_full |
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
title_fullStr |
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
title_full_unstemmed |
QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS |
title_sort |
quartz sand reserve estimation and mine scheduling of pt xyz in bangka belitung islands |
url |
https://digilib.itb.ac.id/gdl/view/80472 |
_version_ |
1822996809427976192 |