QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS
Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planni...
Saved in:
Main Author: | Lucas Sinaga, Raditya |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80472 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SLOPE STABILITY ANALYSIS FOR PT ABC'S QUARTZ SAND MINE ULTIMATE PIT LIMIT, BANGKA BELITUNG
by: Nabila, Lubna -
CHARACTERISTICS OF QUARTZ SAND MATERIAL AND ASSOCIATED MINERALS FORM THE BY-PRODUCT OF ALLUVIAL TIN PROCESSING IN BANGKA AND BELITUNG ISLANDS, INDONESIA
by: Dwi Utami, Shelia -
STUDY OF MINING OPTIMIZATION AT PIT B PT XYZ, BANGKA BELITUNG PROVINCE
by: MAGISTRA (NIM : 12114071), AGNA -
STUDY OF MINING OPTIMIZATION AT PIT B PT XYZ, BANGKA BELITUNG PROVINCE
by: Magistra, Agna -
STUDY OF MINING OPTIMIZATION AT ACTIVE PIT A PT XYZ, BANGKA BELITUNG PROVINCE
by: Bima Yurdhika - Nim: 12114057 , Shobiya