QUARTZ SAND RESERVE ESTIMATION AND MINE SCHEDULING OF PT XYZ IN BANGKA BELITUNG ISLANDS

Residual quartz sand from tin processing activities can be processed into marketable material. To do this, quartz sand mining is to be carried out in A Block, B Block, C Block, D Block, and E Block of XYZ Inc. Reserve estimation and mine scheduling are inseparable from the quartz sand mine planni...

Full description

Saved in:
Bibliographic Details
Main Author: Lucas Sinaga, Raditya
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80472
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items