PRELIMINARY DESIGN OF GAS TURBINE WITH MULTI-SPOOL (CASE STUDY : M701F GAS TURBINE)

Energy transition is of particular concern to the Indonesian government at the moment. Until 2023, the increase in PLN's power generation capacity has been dominated by an increase in the capacity of PLTGU and PLTG. Until 2022, the total generating capacity of PLTU and PLTGU reached 32.4% of PL...

Full description

Saved in:
Bibliographic Details
Main Author: Syamsa Ramadan, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/87182
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia