PRELIMINARY DESIGN OF GAS TURBINE WITH MULTI-SPOOL (CASE STUDY : M701F GAS TURBINE)
Energy transition is of particular concern to the Indonesian government at the moment. Until 2023, the increase in PLN's power generation capacity has been dominated by an increase in the capacity of PLTGU and PLTG. Until 2022, the total generating capacity of PLTU and PLTGU reached 32.4% of PL...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87182 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!