PRELIMINARY DESIGN OF GAS TURBINE WITH MULTI-SPOOL (CASE STUDY : M701F GAS TURBINE)
Energy transition is of particular concern to the Indonesian government at the moment. Until 2023, the increase in PLN's power generation capacity has been dominated by an increase in the capacity of PLTGU and PLTG. Until 2022, the total generating capacity of PLTU and PLTGU reached 32.4% of PL...
Saved in:
Main Author: | Syamsa Ramadan, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87182 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PRELIMINARY DESIGN OF THE M701D GAS TURBINE OF POWER PLANT WITH CONSTANT POWER
by: Sukma Budi Darmawan, Angga -
ANALYSIS OF OPENED SCOOP AND CLOSED SCOOP TYPE COMBUSTOR APPLIED ON GAS TURBINE MW 701D
by: Tongam Samosir, Mangihut -
Gas turbines
by: Cruz, Paul L.
Published: (1956) -
DESIGN OF SINGLE STAGE AXIAL POWER TURBINE ON ULTRA MICRO GAS TURBINE ENGINE
by: Gidion Solissa, Rizal -
DESIGN AND GAS FLOW MODELLING OF RADIAL-INFLOW TURBINE USING MEANLINE ANALYSIS METHOD AND CFD SIMULATION (STUDY CASE : 100 KW MICRO GAS TURBINE )
by: Dzulfiqar Cahyanto, Ivan