Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo

Decrease in power factor and the appearance of harmonics will reduce efficiency of energy use on electrical systems at PT. Santos Jaya Abadi 3, and can reduce the cost of reactive power in fines by the PLN, then the presence of voltage sag will affect the equipment that is sensitive to voltage drop...

Full description

Saved in:
Bibliographic Details
Main Authors: , DANANG AJI HARTONO, , Alif Subardono, S.T., M.Eng.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/121379/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61464
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.121379
record_format dspace
spelling id-ugm-repo.1213792016-03-04T08:29:17Z https://repository.ugm.ac.id/121379/ Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo , DANANG AJI HARTONO , Alif Subardono, S.T., M.Eng. ETD Decrease in power factor and the appearance of harmonics will reduce efficiency of energy use on electrical systems at PT. Santos Jaya Abadi 3, and can reduce the cost of reactive power in fines by the PLN, then the presence of voltage sag will affect the equipment that is sensitive to voltage drop and voltage drops during motor starting. Presently power quality has become main concern in industrial electrical system. This statement taken from the fact, the industrial loads are sensitive to the voltage deviation. The final project will discuss the evaluation of quality power reduction on the electrical systems and efforts to overcome PT. Santos Jaya Abadi 3, Sidoarjo. The result of measurement and simulation using ETAP Power Station 6.0.0 show that the installation of capacitor bank is able to save power 174.829 KW, so it will reduce the cost of electricity usage PT. Santos Jaya Abadi 3, Sidoarjo. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , DANANG AJI HARTONO and , Alif Subardono, S.T., M.Eng. (2013) Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61464
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, DANANG AJI HARTONO
, Alif Subardono, S.T., M.Eng.
Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
description Decrease in power factor and the appearance of harmonics will reduce efficiency of energy use on electrical systems at PT. Santos Jaya Abadi 3, and can reduce the cost of reactive power in fines by the PLN, then the presence of voltage sag will affect the equipment that is sensitive to voltage drop and voltage drops during motor starting. Presently power quality has become main concern in industrial electrical system. This statement taken from the fact, the industrial loads are sensitive to the voltage deviation. The final project will discuss the evaluation of quality power reduction on the electrical systems and efforts to overcome PT. Santos Jaya Abadi 3, Sidoarjo. The result of measurement and simulation using ETAP Power Station 6.0.0 show that the installation of capacitor bank is able to save power 174.829 KW, so it will reduce the cost of electricity usage PT. Santos Jaya Abadi 3, Sidoarjo.
format Theses and Dissertations
NonPeerReviewed
author , DANANG AJI HARTONO
, Alif Subardono, S.T., M.Eng.
author_facet , DANANG AJI HARTONO
, Alif Subardono, S.T., M.Eng.
author_sort , DANANG AJI HARTONO
title Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
title_short Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
title_full Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
title_fullStr Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
title_full_unstemmed Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
title_sort analisis perbaikan power quality menggunakan etap power station 6.0.0 di pt. santos jaya abadi 3 sidoarjo
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/121379/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61464
_version_ 1681231503731720192