Analisis Perbaikan Power Quality Menggunakan ETAP Power Station 6.0.0 di PT. Santos Jaya Abadi 3 Sidoarjo
Decrease in power factor and the appearance of harmonics will reduce efficiency of energy use on electrical systems at PT. Santos Jaya Abadi 3, and can reduce the cost of reactive power in fines by the PLN, then the presence of voltage sag will affect the equipment that is sensitive to voltage drop...
Saved in:
Main Authors: | , DANANG AJI HARTONO, , Alif Subardono, S.T., M.Eng. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/121379/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61464 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
PERBAIKAN RUGI-RUGI DAYA PADA SISTEM KELISTRIKAN PT. SANTOS JAYA ABADI-INSTANT COFFEE PLANT
by: , ANNISA AMYFARA AZIZAH, et al.
Published: (2014) -
PERANCANGAN KOORDINASI RELE ARUS LEBIH PADA SISTEM LISTRIK INDUSTRI SAMPEL IEEE Std. 242 - 2001 MENGGUNAKAN PROGRAM ETAP POWER STATION 7.5.0
by: , ARIF ROHMAN HABIB, et al.
Published: (2013) -
A design of a 3,600 kw power plants
by: Murillo, George
Published: (1962) -
A design of a 7,600-kw steam power plant
by: Castillo, Pedro A.
Published: (1962) -
A design of a 7,600-kw steam power plant
by: Torres, Renato L.
Published: (1962)