PERANCANGAN ULANG LAYOUT MOLDING PLANT UNTUK MENGURANGI JARAK PENGANGKUTAN DI PT. INGRESS MALINDO VENTURES
The increasing request of customer about production door frame and beltline make the company always to try customer need complete with increasing total production. To increase the total production, its mean the company need more machine and place, so the company build a new plant and the old plant m...
Saved in:
Main Authors: | , TAUFIK HIDAYAT, , Ir.Andr.SURJAKA Isp.,MT |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122204/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62303 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
Perancangan Semigantry Crane
Kapasitas 60 Ton
by: , RIZAL BANU AJI, et al.
Published: (2013) -
INGRESS OF CHILORIDE IN CONCRETE
by: WONG SOOK FUN
Published: (2020) -
ANALISA STRUKTUR MIKRO DAN KEKERASAN CIRCULAR SAW MS CUTTING
by: , WISNU FREDIANTO, et al.
Published: (2014) -
ANALISA KERUSAKAN PADA CYLINDER HYDRAULIC BUCKET EXCAVATOR HITACHI EX2500
by: , ANDRIYAN SAPUTRA, et al.
Published: (2013) -
IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY
DI PT. PANATA JAYA MANDIRI
by: , ORI SOBARI, et al.
Published: (2013)