PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)

Labor is a very important factor in building industrial development. Therefore labor factor must exist in every industry, especially industrial production process is still done manually by humans, one of which GNP Snack industry. The problems that arise in industry GNP Snack is no fixed number of wo...

Full description

Saved in:
Bibliographic Details
Main Authors: , RHAMADHANI RIO SATRIA NOVRIAN, , Ir. Guntarti Tatik Mulyati, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/122261/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62360
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.122261
record_format dspace
spelling id-ugm-repo.1222612016-03-04T08:42:18Z https://repository.ugm.ac.id/122261/ PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan) , RHAMADHANI RIO SATRIA NOVRIAN , Ir. Guntarti Tatik Mulyati, MT. ETD Labor is a very important factor in building industrial development. Therefore labor factor must exist in every industry, especially industrial production process is still done manually by humans, one of which GNP Snack industry. The problems that arise in industry GNP Snack is no fixed number of workers, particularly in the production process. This could hamper the achievement of the target industry, the level of productivity. Because the target is not working optimally, it is necessary to research on the determination of the optimal amount of labor by measuring the cycle time for every activity Ceriping Cassava production process to obtain the standard time. In determining the standard time, of course, the adjustment factors and factors to consider leniency. That is with Westinghouse�s system that drive 4 assessment on factors such as skill, effort, condition, and consistency. Where the latter will obtain the theoretical amount of labor in every activity on the production of Ceriping Cassava by 8 labor with details on stripping activities (3), cutting (1 person), frying (2 people), packaging and binding package (2 people). [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , RHAMADHANI RIO SATRIA NOVRIAN and , Ir. Guntarti Tatik Mulyati, MT. (2013) PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62360
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, RHAMADHANI RIO SATRIA NOVRIAN
, Ir. Guntarti Tatik Mulyati, MT.
PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
description Labor is a very important factor in building industrial development. Therefore labor factor must exist in every industry, especially industrial production process is still done manually by humans, one of which GNP Snack industry. The problems that arise in industry GNP Snack is no fixed number of workers, particularly in the production process. This could hamper the achievement of the target industry, the level of productivity. Because the target is not working optimally, it is necessary to research on the determination of the optimal amount of labor by measuring the cycle time for every activity Ceriping Cassava production process to obtain the standard time. In determining the standard time, of course, the adjustment factors and factors to consider leniency. That is with Westinghouse�s system that drive 4 assessment on factors such as skill, effort, condition, and consistency. Where the latter will obtain the theoretical amount of labor in every activity on the production of Ceriping Cassava by 8 labor with details on stripping activities (3), cutting (1 person), frying (2 people), packaging and binding package (2 people).
format Theses and Dissertations
NonPeerReviewed
author , RHAMADHANI RIO SATRIA NOVRIAN
, Ir. Guntarti Tatik Mulyati, MT.
author_facet , RHAMADHANI RIO SATRIA NOVRIAN
, Ir. Guntarti Tatik Mulyati, MT.
author_sort , RHAMADHANI RIO SATRIA NOVRIAN
title PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
title_short PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
title_full PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
title_fullStr PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
title_full_unstemmed PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
title_sort penentuan jumlah pekerja berdasarkan waktu baku (studi di bagian produksi gnp snack, muntilan)
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/122261/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62360
_version_ 1681231669810429952