PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
Labor is a very important factor in building industrial development. Therefore labor factor must exist in every industry, especially industrial production process is still done manually by humans, one of which GNP Snack industry. The problems that arise in industry GNP Snack is no fixed number of wo...
Saved in:
Main Authors: | , RHAMADHANI RIO SATRIA NOVRIAN, , Ir. Guntarti Tatik Mulyati, MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122261/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62360 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
PENGUKURAN PRODUKTIVITAS PADA PROSES PRODUKSI INDUSTRI GNP SNACK, MUNTILAN DENGAN
PENDEKATAN RASIO OUTPUT/INPUT
by: , ARTIKA DESIMETRI, et al.
Published: (2014) -
PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
by: , AGRA ZULFANUDDIN, et al.
Published: (2014) -
TEKNIK PENDUGAAN UMUR SIMPAN PRODUK KERIPIK
SINGKONG TERKEMAS
(Studi Kasus di GNP Snack Muntilan, Magelang, Jawa Tengah)
by: , UMI LATIFAH YUSUF ABDULLAH, et al.
Published: (2013) -
PENENTUAN JUMLAH TENAGA KERJA DAN MESIN PADA PROSES PRODUKSI MIE LETHEK DI UD REVOLUSI DENGAN MENGGUNAKAN DATA STUDI WAKTU
by: , IVAN YOSPRIMA, et al.
Published: (2014) -
ANALISIS PENGGUNAAN BAHAN PENGEMAS PADA PRODUK CERIPING SINGKONG BERDASARKAN HASIL
UJI TARIK DAN UJI WVTR (WATER VAPOUR TRANSMISSION RATE) DI GNP SNACK MUNTILAN
by: , EFRILIA LENI E, et al.
Published: (2014)