PERANCANGAN KONSTRUKSI PERLINDUNGAN LERENG DENGAN KOMBINASI RIP-RAP DAN WOODEN PILE DI TEPI SUNGAI KAPUAS, KALIMANTAN BARAT
PLTU Parit Baru is located on the edge of the trench Kapuas River where the topography conditionare slight slope and in the form of clay. The clay soil depth is 30 m. The problem appears when the tidal river water for PLTU area is flooded. Therefore, soil elevation should be increased and need const...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/124495/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64648 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |