PERANCANGAN KONSTRUKSI PERLINDUNGAN LERENG DENGAN KOMBINASI RIP-RAP DAN WOODEN PILE DI TEPI SUNGAI KAPUAS, KALIMANTAN BARAT

PLTU Parit Baru is located on the edge of the trench Kapuas River where the topography conditionare slight slope and in the form of clay. The clay soil depth is 30 m. The problem appears when the tidal river water for PLTU area is flooded. Therefore, soil elevation should be increased and need const...

Full description

Saved in:
Bibliographic Details
Main Authors: , KIKI KRISDINA, , Teuku Faisal Fathani, ST., MT., Ph.D
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/124495/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64648
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Be the first to leave a comment!
You must be logged in first