METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU

Girder bridge system is a structure of bridge where the main component consisted by prestressing concrete girder. The length of prestressing concrete usually have a length over than 20 m till 40 m. Example of girder bridge that usually we see is river bridge. Girder at Kaki Seribu Bridge Project Tol...

Full description

Saved in:
Bibliographic Details
Main Authors: , OKVIAWARNI EKAPUTRI, , Lava Himawan, ST., MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132432/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72966
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada