METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
Girder bridge system is a structure of bridge where the main component consisted by prestressing concrete girder. The length of prestressing concrete usually have a length over than 20 m till 40 m. Example of girder bridge that usually we see is river bridge. Girder at Kaki Seribu Bridge Project Tol...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/132432/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72966 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Be the first to leave a comment!