METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU

Girder bridge system is a structure of bridge where the main component consisted by prestressing concrete girder. The length of prestressing concrete usually have a length over than 20 m till 40 m. Example of girder bridge that usually we see is river bridge. Girder at Kaki Seribu Bridge Project Tol...

Full description

Saved in:
Bibliographic Details
Main Authors: , OKVIAWARNI EKAPUTRI, , Lava Himawan, ST., MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/132432/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72966
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.132432
record_format dspace
spelling id-ugm-repo.1324322016-03-04T08:05:48Z https://repository.ugm.ac.id/132432/ METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU , OKVIAWARNI EKAPUTRI , Lava Himawan, ST., MT. ETD Girder bridge system is a structure of bridge where the main component consisted by prestressing concrete girder. The length of prestressing concrete usually have a length over than 20 m till 40 m. Example of girder bridge that usually we see is river bridge. Girder at Kaki Seribu Bridge Project Tol JORR W2N use prestressing girder as top structure with length is 20 m and 40 m. This long girder use prestressing concrete girder type segmental PCI girder with post-tension prestressing method. Quality concrete use class A K-500 with f�c is 41,5 mpa. And method of erection with 2 cranes. The results show that girder 20 m and 40 m have difference and equation at every step implementation of production and erection at field. Quantity and type of reinforcement, quantity of duck, value of jacking force of shorter girder is smaller than longer girder, while the compressive strength, implementation of stressing dan method of erection of girder is same between 20 m and 40 m. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , OKVIAWARNI EKAPUTRI and , Lava Himawan, ST., MT. (2014) METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72966
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, OKVIAWARNI EKAPUTRI
, Lava Himawan, ST., MT.
METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
description Girder bridge system is a structure of bridge where the main component consisted by prestressing concrete girder. The length of prestressing concrete usually have a length over than 20 m till 40 m. Example of girder bridge that usually we see is river bridge. Girder at Kaki Seribu Bridge Project Tol JORR W2N use prestressing girder as top structure with length is 20 m and 40 m. This long girder use prestressing concrete girder type segmental PCI girder with post-tension prestressing method. Quality concrete use class A K-500 with f�c is 41,5 mpa. And method of erection with 2 cranes. The results show that girder 20 m and 40 m have difference and equation at every step implementation of production and erection at field. Quantity and type of reinforcement, quantity of duck, value of jacking force of shorter girder is smaller than longer girder, while the compressive strength, implementation of stressing dan method of erection of girder is same between 20 m and 40 m.
format Theses and Dissertations
NonPeerReviewed
author , OKVIAWARNI EKAPUTRI
, Lava Himawan, ST., MT.
author_facet , OKVIAWARNI EKAPUTRI
, Lava Himawan, ST., MT.
author_sort , OKVIAWARNI EKAPUTRI
title METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
title_short METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
title_full METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
title_fullStr METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
title_full_unstemmed METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
title_sort metode pelaksanaan pembuatan dan pemasangan girder prategang pada jembatan kaki seribu
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/132432/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72966
_version_ 1681233501828939776