Pemodelan laju pelepasan dan waktu tempuh radionuklida dalam air tanah pada calon lokasi penyimpanan lestari limbah radioaktif tingkat tinggi di P. Genting, Karimunjawa

ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia will build several nuclear power plants (NPPs). Feasibility study held by consultant appointed by Indonesian government, highly indicated that the first NPP will be built in Muria, Jepara (NEWJEC, 19...

Full description

Saved in:
Bibliographic Details
Main Author: Perpustakaan UGM, i-lib
Format: Article NonPeerReviewed
Published: [Yogyakarta] : Pusat Studi Lingkungan Hidup,UGM 1998
Subjects:
Online Access:https://repository.ugm.ac.id/20821/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=3679
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada