Pemodelan laju pelepasan dan waktu tempuh radionuklida dalam air tanah pada calon lokasi penyimpanan lestari limbah radioaktif tingkat tinggi di P. Genting, Karimunjawa

ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia will build several nuclear power plants (NPPs). Feasibility study held by consultant appointed by Indonesian government, highly indicated that the first NPP will be built in Muria, Jepara (NEWJEC, 19...

全面介紹

Saved in:
書目詳細資料
主要作者: Perpustakaan UGM, i-lib
格式: Article NonPeerReviewed
出版: [Yogyakarta] : Pusat Studi Lingkungan Hidup,UGM 1998
主題:
在線閱讀:https://repository.ugm.ac.id/20821/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=3679
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Universitas Gadjah Mada

相似書籍