Pemodelan laju pelepasan dan waktu tempuh radionuklida dalam air tanah pada calon lokasi penyimpanan lestari limbah radioaktif tingkat tinggi di P. Genting, Karimunjawa
ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia will build several nuclear power plants (NPPs). Feasibility study held by consultant appointed by Indonesian government, highly indicated that the first NPP will be built in Muria, Jepara (NEWJEC, 19...
Saved in:
Main Author: | |
---|---|
Format: | Article NonPeerReviewed |
Published: |
[Yogyakarta] : Pusat Studi Lingkungan Hidup,UGM
1998
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/20821/ http://i-lib.ugm.ac.id/jurnal/download.php?dataId=3679 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Be the first to leave a comment!