Pemodelan laju pelepasan dan waktu tempuh radionuklida dalam air tanah pada calon lokasi penyimpanan lestari limbah radioaktif tingkat tinggi di P. Genting, Karimunjawa
ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia will build several nuclear power plants (NPPs). Feasibility study held by consultant appointed by Indonesian government, highly indicated that the first NPP will be built in Muria, Jepara (NEWJEC, 19...
Saved in:
主要作者: | |
---|---|
格式: | Article NonPeerReviewed |
出版: |
[Yogyakarta] : Pusat Studi Lingkungan Hidup,UGM
1998
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/20821/ http://i-lib.ugm.ac.id/jurnal/download.php?dataId=3679 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Universitas Gadjah Mada |