A system study on the electrical installation of ANVIC Construction Philippines Inc.

ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanshi...

Full description

Saved in:
Bibliographic Details
Main Authors: Co, Lysander Cyprian C., Constantino, Marc Jullian M., De Guzman, Chris Joshua L.
Format: text
Language:English
Published: Animo Repository 2015
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/7274
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
Description
Summary:ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanship non-conformances which results to rework cost of Php2,698,718.26. To address this problem a why-why diagram was used to analyze the cause of the problem in each of the 6 projects. It was determined that they experience these problems because of the poor progress monitoring of each project, the lack of supervisory and management skills of higher level managers, and the poor inventory management being implemented by the company. The solutions that were chosen after performing the Kepner Tregoe decision analysis was the monitoring using the Kanban system, providing training and sending foremen to seminars, and implementing an inventory management and tracking system that will ensure that all raw materials would be present in time for scheduled installation. By implementing of the proposed solutions, the company would be able to reduce and eliminate their problem of incurring rework due to workmanship. Furthermore, all proposed solutions can be implemented within 3 months. It was computed that the processed solution have a net present value of Php2,632,118.26.