A system study on the electrical installation of ANVIC Construction Philippines Inc.

ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanshi...

Full description

Saved in:
Bibliographic Details
Main Authors: Co, Lysander Cyprian C., Constantino, Marc Jullian M., De Guzman, Chris Joshua L.
Format: text
Language:English
Published: Animo Repository 2015
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/7274
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-7918
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-79182021-08-11T15:30:58Z A system study on the electrical installation of ANVIC Construction Philippines Inc. Co, Lysander Cyprian C. Constantino, Marc Jullian M. De Guzman, Chris Joshua L. ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanship non-conformances which results to rework cost of Php2,698,718.26. To address this problem a why-why diagram was used to analyze the cause of the problem in each of the 6 projects. It was determined that they experience these problems because of the poor progress monitoring of each project, the lack of supervisory and management skills of higher level managers, and the poor inventory management being implemented by the company. The solutions that were chosen after performing the Kepner Tregoe decision analysis was the monitoring using the Kanban system, providing training and sending foremen to seminars, and implementing an inventory management and tracking system that will ensure that all raw materials would be present in time for scheduled installation. By implementing of the proposed solutions, the company would be able to reduce and eliminate their problem of incurring rework due to workmanship. Furthermore, all proposed solutions can be implemented within 3 months. It was computed that the processed solution have a net present value of Php2,632,118.26. 2015-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/7274 Bachelor's Theses English Animo Repository Engineering systems Industrial engineering ANVIC Construction Philippines Inc Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Engineering systems
Industrial engineering
ANVIC Construction Philippines Inc
Industrial Engineering
spellingShingle Engineering systems
Industrial engineering
ANVIC Construction Philippines Inc
Industrial Engineering
Co, Lysander Cyprian C.
Constantino, Marc Jullian M.
De Guzman, Chris Joshua L.
A system study on the electrical installation of ANVIC Construction Philippines Inc.
description ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanship non-conformances which results to rework cost of Php2,698,718.26. To address this problem a why-why diagram was used to analyze the cause of the problem in each of the 6 projects. It was determined that they experience these problems because of the poor progress monitoring of each project, the lack of supervisory and management skills of higher level managers, and the poor inventory management being implemented by the company. The solutions that were chosen after performing the Kepner Tregoe decision analysis was the monitoring using the Kanban system, providing training and sending foremen to seminars, and implementing an inventory management and tracking system that will ensure that all raw materials would be present in time for scheduled installation. By implementing of the proposed solutions, the company would be able to reduce and eliminate their problem of incurring rework due to workmanship. Furthermore, all proposed solutions can be implemented within 3 months. It was computed that the processed solution have a net present value of Php2,632,118.26.
format text
author Co, Lysander Cyprian C.
Constantino, Marc Jullian M.
De Guzman, Chris Joshua L.
author_facet Co, Lysander Cyprian C.
Constantino, Marc Jullian M.
De Guzman, Chris Joshua L.
author_sort Co, Lysander Cyprian C.
title A system study on the electrical installation of ANVIC Construction Philippines Inc.
title_short A system study on the electrical installation of ANVIC Construction Philippines Inc.
title_full A system study on the electrical installation of ANVIC Construction Philippines Inc.
title_fullStr A system study on the electrical installation of ANVIC Construction Philippines Inc.
title_full_unstemmed A system study on the electrical installation of ANVIC Construction Philippines Inc.
title_sort system study on the electrical installation of anvic construction philippines inc.
publisher Animo Repository
publishDate 2015
url https://animorepository.dlsu.edu.ph/etd_bachelors/7274
_version_ 1772834722139865088