Action research on documenting the validation of output of the risk & control self-assessment

This action research is focused on documenting the conduct of validation activity for the risk assessment tool, which is the risk & control self-assessment (RCSA). The primary objective is to comply with the requirements of the banking regulators. Furthermore, this paper aims to strengthen the r...

Full description

Saved in:
Bibliographic Details
Main Author: Ouano, Arlene E.
Format: text
Language:English
Published: Animo Repository 2020
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_masteral/6028
https://animorepository.dlsu.edu.ph/context/etd_masteral/article/13146/viewcontent/Ouano_Arlene_09081143_Documenting_the_Validation_of_Output_of_the_Risk___Control_Self_Assessment_1_Redacted.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_masteral-13146
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_masteral-131462022-05-27T08:25:32Z Action research on documenting the validation of output of the risk & control self-assessment Ouano, Arlene E. This action research is focused on documenting the conduct of validation activity for the risk assessment tool, which is the risk & control self-assessment (RCSA). The primary objective is to comply with the requirements of the banking regulators. Furthermore, this paper aims to strengthen the relationship of risk management team with the business units by constant communication through the discussion of various risk issues and concerns and to enhance level of risk awareness, responsibility and accountability within business units. The first cycle involves identification of data needed in the validation and development of validation template. Each data was then assessed and categorized based on whether as outstanding findings, closed findings or repeat findings. The second cycle includes collecting of data identified from independent offices. Data were classified into risk events and by causes of risk. There are seven (7) risk events: internal fraud; external fraud; execution delivery & process management; employment practices and workplace safety; clients, products & business practices; business disruption and system failure; damage to physical assets. Also, causes of risk include: people, process, system and external events. Cycle 1 of this action research revealed that knowledge gap is evident within the team. Classroom training sessions and coaching were then conducted in the second cycle to address the issue. In the end, this action research successfully documented the validation of the output of for the RCSA 2020-09-01T07:00:00Z text application/pdf https://animorepository.dlsu.edu.ph/etd_masteral/6028 https://animorepository.dlsu.edu.ph/context/etd_masteral/article/13146/viewcontent/Ouano_Arlene_09081143_Documenting_the_Validation_of_Output_of_the_Risk___Control_Self_Assessment_1_Redacted.pdf Master's Theses English Animo Repository Risk assessment Business Administration, Management, and Operations
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Risk assessment
Business Administration, Management, and Operations
spellingShingle Risk assessment
Business Administration, Management, and Operations
Ouano, Arlene E.
Action research on documenting the validation of output of the risk & control self-assessment
description This action research is focused on documenting the conduct of validation activity for the risk assessment tool, which is the risk & control self-assessment (RCSA). The primary objective is to comply with the requirements of the banking regulators. Furthermore, this paper aims to strengthen the relationship of risk management team with the business units by constant communication through the discussion of various risk issues and concerns and to enhance level of risk awareness, responsibility and accountability within business units. The first cycle involves identification of data needed in the validation and development of validation template. Each data was then assessed and categorized based on whether as outstanding findings, closed findings or repeat findings. The second cycle includes collecting of data identified from independent offices. Data were classified into risk events and by causes of risk. There are seven (7) risk events: internal fraud; external fraud; execution delivery & process management; employment practices and workplace safety; clients, products & business practices; business disruption and system failure; damage to physical assets. Also, causes of risk include: people, process, system and external events. Cycle 1 of this action research revealed that knowledge gap is evident within the team. Classroom training sessions and coaching were then conducted in the second cycle to address the issue. In the end, this action research successfully documented the validation of the output of for the RCSA
format text
author Ouano, Arlene E.
author_facet Ouano, Arlene E.
author_sort Ouano, Arlene E.
title Action research on documenting the validation of output of the risk & control self-assessment
title_short Action research on documenting the validation of output of the risk & control self-assessment
title_full Action research on documenting the validation of output of the risk & control self-assessment
title_fullStr Action research on documenting the validation of output of the risk & control self-assessment
title_full_unstemmed Action research on documenting the validation of output of the risk & control self-assessment
title_sort action research on documenting the validation of output of the risk & control self-assessment
publisher Animo Repository
publishDate 2020
url https://animorepository.dlsu.edu.ph/etd_masteral/6028
https://animorepository.dlsu.edu.ph/context/etd_masteral/article/13146/viewcontent/Ouano_Arlene_09081143_Documenting_the_Validation_of_Output_of_the_Risk___Control_Self_Assessment_1_Redacted.pdf
_version_ 1772835874804858880