Simultaneous minimization of cycle time and workstations with stochastic task times in a continuous assembly line production system
Based on the literature and articles reviewed, there was not a single study that deals with the simultaneous determination of the cycle time and number of workstations under stochastic times. Most of the considered deterministic task times with only one objective which is minimizing the idle time in...
Saved in:
主要作者: | |
---|---|
格式: | text |
語言: | English |
出版: |
Animo Repository
1997
|
主題: | |
在線閱讀: | https://animorepository.dlsu.edu.ph/etd_masteral/1824 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | De La Salle University |
語言: | English |