Heuristics with guaranteed performance bounds for a manufacturing system with product recovery
We consider a manufacturing system with product recovery. The system manufactures a new product as well as remanufactures the product from old, returned items. The items remanufactured with the returned products are as good as new and satisfy the same demand as the new item. The demand rate for the...
Saved in:
Main Authors: | Feng, Yan, Viswanathan, S. |
---|---|
Other Authors: | Nanyang Business School |
Format: | Article |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/103121 http://hdl.handle.net/10220/19242 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Productivity analysis for Singapore manufacturing industries : a stochastic frontier approach.
by: Koh, Soo Wei.
Published: (2008) -
Determinants of R&D activities and performances of firms in Singapore manufacturing sector
by: Auw, Chor Khoon, et al.
Published: (2011) -
农业生产组织形式及效益分析 = Organization and performance of agricultural production in China
by: 吕峰 Lu, Feng, et al.
Published: (2008) -
Growth strategy of contract manufacturers.
by: Tay, Lim Low.
Published: (2009) -
Growth and financial profiles of manufacturing SMEs.
by: Chong, Han Lim., et al.
Published: (2008)