Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Althoug...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Published: |
2019
|
Online Access: | https://hdl.handle.net/10356/106499 http://hdl.handle.net/10220/48188 https://doi.org/10.1080/00207543.2018.1521532 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-106499 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-1064992019-12-06T22:13:02Z Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system Tiong, Lee Kong Chen, Chen Chen, I-Ming In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice. 2019-05-14T06:49:25Z 2019-12-06T22:13:02Z 2019-05-14T06:49:25Z 2019-12-06T22:13:02Z 2019 Journal Article Chen, C., Tiong, L. K., & Chen, I.-M. (2018). Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system. International Journal of Production Research, 1-17. doi:10.1080/00207543.2018.1521532 0020-7543 https://hdl.handle.net/10356/106499 http://hdl.handle.net/10220/48188 https://doi.org/10.1080/00207543.2018.1521532 213592 International Journal of Production Research |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
description |
In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice. |
format |
Article |
author |
Tiong, Lee Kong Chen, Chen Chen, I-Ming |
spellingShingle |
Tiong, Lee Kong Chen, Chen Chen, I-Ming Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
author_facet |
Tiong, Lee Kong Chen, Chen Chen, I-Ming |
author_sort |
Tiong, Lee Kong |
title |
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
title_short |
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
title_full |
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
title_fullStr |
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
title_full_unstemmed |
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system |
title_sort |
using a genetic algorithm to schedule the space-constrained agv-based prefabricated bathroom units manufacturing system |
publishDate |
2019 |
url |
https://hdl.handle.net/10356/106499 http://hdl.handle.net/10220/48188 https://doi.org/10.1080/00207543.2018.1521532 |
_version_ |
1681038401738899456 |