Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system

In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Althoug...

Full description

Saved in:
Bibliographic Details
Main Authors: Tiong, Lee Kong, Chen, Chen, Chen, I-Ming
Format: Article
Published: 2019
Online Access:https://hdl.handle.net/10356/106499
http://hdl.handle.net/10220/48188
https://doi.org/10.1080/00207543.2018.1521532
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-106499
record_format dspace
spelling sg-ntu-dr.10356-1064992019-12-06T22:13:02Z Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system Tiong, Lee Kong Chen, Chen Chen, I-Ming In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice. 2019-05-14T06:49:25Z 2019-12-06T22:13:02Z 2019-05-14T06:49:25Z 2019-12-06T22:13:02Z 2019 Journal Article Chen, C., Tiong, L. K., & Chen, I.-M. (2018). Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system. International Journal of Production Research, 1-17. doi:10.1080/00207543.2018.1521532 0020-7543 https://hdl.handle.net/10356/106499 http://hdl.handle.net/10220/48188 https://doi.org/10.1080/00207543.2018.1521532 213592 International Journal of Production Research
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
description In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice.
format Article
author Tiong, Lee Kong
Chen, Chen
Chen, I-Ming
spellingShingle Tiong, Lee Kong
Chen, Chen
Chen, I-Ming
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
author_facet Tiong, Lee Kong
Chen, Chen
Chen, I-Ming
author_sort Tiong, Lee Kong
title Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
title_short Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
title_full Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
title_fullStr Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
title_full_unstemmed Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
title_sort using a genetic algorithm to schedule the space-constrained agv-based prefabricated bathroom units manufacturing system
publishDate 2019
url https://hdl.handle.net/10356/106499
http://hdl.handle.net/10220/48188
https://doi.org/10.1080/00207543.2018.1521532
_version_ 1681038401738899456