Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Althoug...
Saved in:
Main Authors: | Tiong, Lee Kong, Chen, Chen, Chen, I-Ming |
---|---|
Format: | Article |
Published: |
2019
|
Online Access: | https://hdl.handle.net/10356/106499 http://hdl.handle.net/10220/48188 https://doi.org/10.1080/00207543.2018.1521532 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
by: Han, Jinchi, et al.
Published: (2024) -
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
by: Cai, Yiyu, et al.
Published: (2019) -
AUTOMATED QUALITY INSPECTION OF PREFABRICATED BATHROOM UNITS USING BIM AND LASER SCANNING: A SINGAPORE CONTEXT
by: YUN SOL
Published: (2019) -
AGV scheduling algorithms for container ports
by: Lim, Hyun Jeong
Published: (2019) -
Using queuing theory and simulated annealing to design the facility layout in an AGV-based modular manufacturing system
by: Chen, Chen, et al.
Published: (2019)