Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system

In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Althoug...

Full description

Saved in:
Bibliographic Details
Main Authors: Tiong, Lee Kong, Chen, Chen, Chen, I-Ming
Format: Article
Published: 2019
Online Access:https://hdl.handle.net/10356/106499
http://hdl.handle.net/10220/48188
https://doi.org/10.1080/00207543.2018.1521532
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Be the first to leave a comment!
You must be logged in first