A framework for an integrated change program : combining TQM and BPR

The aim of the study is to build a framework for an integrated change program that enables organisations to obtain and sustain competitive advantage. The integrated framework is derived from the principles of TQM (Total Quality Management) and BPR (Business Process Reengineering). The study looks in...

Full description

Saved in:
Bibliographic Details
Main Author: Yan, Yew Tong
Other Authors: Yeo, Khim Teck
Format: Theses and Dissertations
Language:English
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/13464
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-13464
record_format dspace
spelling sg-ntu-dr.10356-134642023-03-11T16:52:26Z A framework for an integrated change program : combining TQM and BPR Yan, Yew Tong Yeo, Khim Teck School of Mechanical and Production Engineering DRNTU::Engineering::Manufacturing::Production management DRNTU::Engineering::Manufacturing::Quality control The aim of the study is to build a framework for an integrated change program that enables organisations to obtain and sustain competitive advantage. The integrated framework is derived from the principles of TQM (Total Quality Management) and BPR (Business Process Reengineering). The study looks into the underlying reasons and trends for organisational change, based on a literature review on organisation models, life cycle concept, organisational changes in practice, and the various organisational paradigms. Special focus is on the implementation steps for the two change programs TQM and BPR. The similarities and differences between the programs are also discussed. In the second part of the study, the opportunity for integrating TQM and BPR is presented, together with the change enablers and management fundamentals essential to the successful implementation of a change program. The enablers and fundamentals also deal with resistance to change and managing the transition to the new process. The various phases of the framework are elaborated. Case studies are then performed on two companies, AlliedSignal and a Singapore aerospace company, which are involved in BPR and TQM change programs respectively. It is shown that the companies went through similar change implementation stages as the proposed framework. In the last part of the study, the further applications of the proposed framework, problems and challenges in the Singapore context are discussed. Master of Science (Computer Integrated Manufacturing) 2008-08-19T02:32:07Z 2008-10-20T08:19:25Z 2008-08-19T02:32:07Z 2008-10-20T08:19:25Z 1999 1999 Thesis http://hdl.handle.net/10356/13464 en 93 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Manufacturing::Production management
DRNTU::Engineering::Manufacturing::Quality control
spellingShingle DRNTU::Engineering::Manufacturing::Production management
DRNTU::Engineering::Manufacturing::Quality control
Yan, Yew Tong
A framework for an integrated change program : combining TQM and BPR
description The aim of the study is to build a framework for an integrated change program that enables organisations to obtain and sustain competitive advantage. The integrated framework is derived from the principles of TQM (Total Quality Management) and BPR (Business Process Reengineering). The study looks into the underlying reasons and trends for organisational change, based on a literature review on organisation models, life cycle concept, organisational changes in practice, and the various organisational paradigms. Special focus is on the implementation steps for the two change programs TQM and BPR. The similarities and differences between the programs are also discussed. In the second part of the study, the opportunity for integrating TQM and BPR is presented, together with the change enablers and management fundamentals essential to the successful implementation of a change program. The enablers and fundamentals also deal with resistance to change and managing the transition to the new process. The various phases of the framework are elaborated. Case studies are then performed on two companies, AlliedSignal and a Singapore aerospace company, which are involved in BPR and TQM change programs respectively. It is shown that the companies went through similar change implementation stages as the proposed framework. In the last part of the study, the further applications of the proposed framework, problems and challenges in the Singapore context are discussed.
author2 Yeo, Khim Teck
author_facet Yeo, Khim Teck
Yan, Yew Tong
format Theses and Dissertations
author Yan, Yew Tong
author_sort Yan, Yew Tong
title A framework for an integrated change program : combining TQM and BPR
title_short A framework for an integrated change program : combining TQM and BPR
title_full A framework for an integrated change program : combining TQM and BPR
title_fullStr A framework for an integrated change program : combining TQM and BPR
title_full_unstemmed A framework for an integrated change program : combining TQM and BPR
title_sort framework for an integrated change program : combining tqm and bpr
publishDate 2008
url http://hdl.handle.net/10356/13464
_version_ 1761781787029143552