Deep-learning-based automated building construction progress monitoring for prefabricated prefinished volumetric construction
Prefabricated prefinished volumetric construction (PPVC) is a relatively new technique that has recently gained popularity for its ability to improve flexibility in scheduling and resource management. Given the modular nature of PPVC assembly and the large amounts of visual data amassed throughout a...
Saved in:
Main Authors: | Chua, Wei Png, Cheah, Chien Chern |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Article |
Language: | English |
Published: |
2025
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/182116 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Deep learning-based automated building construction progress monitoring for prefabricated prefinished volumetric construction
by: Chua, Wei Png
Published: (2024) -
ADOPTING PREFABRICATED PREFINISHED VOLUMETRIC CONSTRUCTION (PPVC) TO IMPROVE CONSTRUCTION PRODUCTIVITY
by: TAO JUNLIN GRACIOUS
Published: (2017) -
Structural health monitoring of Prefabricated Prefinished Volumetric Construction (PPVC) unit connectors
by: Muhammad Syafiq Mohd Amin
Published: (2020) -
Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
by: Tang, Xiuke
Published: (2020) -
Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies
by: Liu, W.Q., et al.
Published: (2021)