Report on industrial attachment with CNA Group Ltd
For the 22-week Industrial Attachment, the author was recruited by CNA Group Ltd, and was attached to Changi Airport Terminal 3 to assist the project and maintenance department. In this attachment, the author was assigned a few tasks such as to assist the engineering support and maintenance group t...
Saved in:
Main Author: | Cham, Alan Toshihito Jun Wei |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Industrial Attachment (IA) |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Report on industrial attachment report with CNA China Co. Ltd (Beijing, China)
by: Chew, Siew Mooi.
Published: (2011) -
Report on industrial attachment with Honeywell Pte Ltd
by: Toh, Justin Kok Wei.
Published: (2008) -
Industrial attachment report: TDS Technological Pte Ltd
by: Dong, Jun Feng
Published: (2008) -
Report on industrial attachment with Accenture Pte Ltd
by: Isac, Joseph James.
Published: (2008) -
Report on industrial attachment with Micron Semiconductor Asia Pte Ltd
by: Ong, Kok Wei
Published: (2015)