Report on industrial attachment with CNA Group Ltd
For the 22-week Industrial Attachment, the author was recruited by CNA Group Ltd, and was attached to Changi Airport Terminal 3 to assist the project and maintenance department. In this attachment, the author was assigned a few tasks such as to assist the engineering support and maintenance group t...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Be the first to leave a comment!