Project management system on piling project (bored-cast-in-place pile)
The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discuss...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
مؤلفون آخرون: | |
التنسيق: | Theses and Dissertations |
منشور في: |
2009
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10356/19380 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
الملخص: | The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources. |
---|