Project management system on piling project (bored-cast-in-place pile)

The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discuss...

Full description

Saved in:
Bibliographic Details
Main Author: Ng, Lay Hua.
Other Authors: Alum, Jahidul
Format: Theses and Dissertations
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19380
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Description
Summary:The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources.