Project management system on piling project (bored-cast-in-place pile)

The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discuss...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Ng, Lay Hua.
مؤلفون آخرون: Alum, Jahidul
التنسيق: Theses and Dissertations
منشور في: 2009
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10356/19380
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
الوصف
الملخص:The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources.