Project management system on piling project (bored-cast-in-place pile)
The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discuss...
Saved in:
Main Author: | Ng, Lay Hua. |
---|---|
Other Authors: | Alum, Jahidul |
Format: | Theses and Dissertations |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19380 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Productivity aspects of bored piling operations in Singapore
by: Lee, Hong Keow., et al.
Published: (2009) -
Improving the design of bored and cast-in-place piles in residual soils and weathered rocks
by: Chang, Ming Fang., et al.
Published: (2008) -
Evaluation of settlement of bored piles
by: Lee, Christopher Choon Sun.
Published: (2008) -
Bored piling practice in Singapore
by: Lim, You Swan.
Published: (2008) -
Design, construction and performance of micro-piles as compared to bored piles
by: Han, Yung Fung.
Published: (2008)